Warm minimalist 4-room
4-room HDB · Punggol
HDB · Condo · Landed
Renovation and interior design across Singapore, from the first sketch to handover. One team, one itemised quote, and photo updates on WhatsApp every week.
12 yearsrenovating Singapore homes
300+homes completed
8 weeksfor a typical 4-room HDB flat
1 yearworkmanship warranty
Recent projects
4-room HDB · Punggol
3-bedroom condo · Tampines
5-room HDB · Bishan
Terrace house · Serangoon Gardens
2-bedroom condo · Clementi
Semi-detached house · Upper Thomson
Before & after
This 30-year-old kitchen in a 5-room HDB flat in Sengkang had dark cabinets, worn tiles and too little counter space. We opened it up, added an island with seating and brought in warm lighting.
Drag the slider to compare
What we do
Hacking, flooring, electrical, plumbing, ceilings and painting for HDB flats, condos and landed homes.
Layouts that work for Singapore cooking, with quartz tops, proper ventilation and waterproofing that lasts.
Wardrobes, TV consoles, shoe cabinets and kitchen cabinets, made to measure in our own workshop.
See your home in 3D before work starts, with materials and colours chosen together with you.
How we work
We visit your home or meet on a video call within 3 working days.
Layouts, materials and colours, refined with you until it feels right.
Every item and price in writing, so you know exactly what you’re paying for.
Photo updates on WhatsApp every week, and a final walk-through together.
Reviews
Sample reviews, for illustration only
“Our flat was ready a week before our wedding, exactly as planned. The weekly photos meant we never had to chase anyone.”
“The 3D drawings were spot on. What we saw is what we got, and the quotation had no surprises at the end.”
“They handled the HDB permit for us and were patient with all our questions. The kitchen is now our favourite room.”
Free quote
We’ll reply within 1 working day with a rough budget and a time for your free consultation.
Most of our 4-room HDB renovations cost between S$35,000 and S$60,000. It depends on how much carpentry you need, and whether walls are hacked or the flooring is replaced. Your itemised quotation shows every cost before you commit.
About 6 to 8 weeks for a new 4-room HDB flat, and 8 to 12 weeks for a resale flat or a condo. Landed homes usually take 3 to 5 months.
Yes. We apply for the permits your renovation needs and follow HDB’s renovation rules, so you don’t have to deal with the paperwork.
Yes: a 1-year warranty on all our workmanship, plus the manufacturers’ warranties on appliances and materials.
You pay in stages as the work is completed: a deposit to confirm, progress payments during the renovation, and the final payment at handover.
This is a sample website by AI Web Design SG. Saltwood Interiors is a made-up business, and its details, prices and reviews are for illustration only. Want a website like this? Get a free quote or see the other samples.